Blood Centre Sanquin

Colombo, Sri Lanka

Project Scope:
The design, delivery and installation of the HVAC for Sanquin Bloodcentre Cleanroom, non-sterile storage rooms, central sterile room.

Project Data:

Duration:  3 months


1 x Hybrid AHU Max.e2-18, 18.000 m3/h AHU, including TCP-IP control


1 x Hybrid AHU Max.e2-06, 6.000 m3/h AHU, including TCP-IP control


1 x Delivery and installation of duct work and components


1 x Validation program

 

Highlights:
1st Hybrid all-in-one Max.e2-18 AHU, including TCP-IP control in Sri Lanka


1st EU ISO 7 Cleanroom in Sri Lanka