Blood Centre Sanquin

Colombo, Sri Lanka

Project Scope: The design, delivery and installation of the HVAC for Sanquin Bloodcentre Cleanroom, non-sterile storage rooms, central sterile room. Project Data: Duration: 3 months 1 x Hybrid AHU Max.e2-18, 18.000 m3/h AHU, including TCP-IP control 1 x Hybrid AHU Max.e2-06, 6.000 m3/h AHU, including TCP-IP control 1 x Delivery and installation of duct work and components 1 x Validation program Highlights: 1st Hybrid all-in-one Max.e2-18 AHU, including TCP-IP control in Sri Lanka 1st EU ISO 7 Cleanroom in Sri Lanka