Prince Charles Hospital
Brisbane, AUS
Project Scope:
Design, delivery and installation of a HVAC system for a dual procedure theatre built within a modular building.
This temporary buiding will assist with the rising demands for additional clinical capacity due to COVID interruptions. The fully equipped endoscopy facility includes a decontamination suite and a mobile 8-bed recovery ward.
Our solutions are the perfect companion for modular units being placed in areas where space and time are issues.
Project Data:
Duration - 2 months
Overview of deliveries and installations:
1 x Max.e2-03 TOP unit, 3000 m3/h
GALLERY
![](https://static.wixstatic.com/media/7affd9_25af6509e2884f8d887252d4e4654e6e~mv2.jpg/v1/fill/w_293,h_293,q_90/7affd9_25af6509e2884f8d887252d4e4654e6e~mv2.jpg)
![](https://static.wixstatic.com/media/7affd9_5c5932aee317472c94fa3bb2a2430646~mv2.png/v1/fill/w_294,h_293,q_90/7affd9_5c5932aee317472c94fa3bb2a2430646~mv2.png)
![](https://static.wixstatic.com/media/7affd9_854585f7fc7b4470894fb5c5307eb5d3~mv2.png/v1/fill/w_293,h_293,q_90/7affd9_854585f7fc7b4470894fb5c5307eb5d3~mv2.png)
bottom of page